Middle Tennessee Lane Closure Report October 10-16, 2024
DAVIDSON COUNTY I-24
The resurfacing on I-24 from I-65 to I-40 (East loop) including bridge expansion joint repairs (MM 46.6 – 50).
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-24 in both directions for milling and paving operations, along with intermittent temporary ramp closures.
The resurfacing on I-24 near I-440 to near Haywood Lane.
• Nightly, 8 p.m. – 5 a.m. (excluding weekends), There will be alternating lane and ramp closures on I-24 in both directions for milling and paving operations.
RUTHERFORD COUNTY I-24
The resurfacing on I-24 from near the Stones River to east of the CSXT Railroad (MM 78 – 82).
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for milling and paving activities.
The improvement of off-ramp on I-24 and I-231.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-24 WB for setting barrier rail and pavement markings.
DAVIDSON COUNTY I-40
The repair of the bridge on I-40 over the Harpeth River including grading, drainage, and paving.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-40 at mile marker 195 over the Harpeth River to install Phase 1 barrier wall.
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange.
• Daily (excluding weekends), 1 p.m., There will be an alternating rolling roadblock on I-40 in both directions for blasting (MM 214.4 – 218).
The repair of the bridge on the I-40 WB merge ramp over the I-65 NB merge ramp.
• Continuous, The ramp from I-40 WB to I-65 SB will be one lane through November 15th.
HUMPHREYS COUNTY I-40
The repair of the bridges on I-40 over Squeeze Bottom Road and the Buffalo River Bridge.
• Nightly, 7 p.m. – 5 a.m., There will be temporary lane closures in both directions for roadway maintenance. One lane will remain open at all times.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in Dickson County to near U.S. 70S (Exit 196) in Davidson County.
• Daily, 7:30 a.m. – 6 p.m., There will be shoulder closures in both directions for punch list items and for monitoring devices for the burn-in period.
DAVIDSON COUNTY I-65
The repair of the bridge on the I-40 WB merge ramp over the I-65 NB merge ramp.
• Nightly (excluding weekends), 9 p.m. – 5 a.m., There will be lane closures on the I-65 NB merge ramp at Exit 82B from the split of Exits A&B to the merge of I-65 NB/I-40 EB for bridge construction activities.
ROBERTSON COUNTY I-65
I-65 SB weigh station improvements near the Kentucky state line (MM 118 – 120).
• 10/10 – 10/16, continuous, There will be shoulder closures from the on-ramp to the off-ramp of the southbound weight station. Shoulder is closed with concrete barrier rail.
WILLIAMSON COUNTY I-65
The repair of the bridge on SR 96 over I-65 (MM 64.2 – 66).
• Nightly, 8 p.m. – 5 a.m. (excluding Sunday), There will be lane closures on I-65 in both directions for bridge repair on the median.
DAVIDSON COUNTY I-440
On-call concrete pavement repair at various locations in Region 3.
• 10/10, 8 p.m. – 5 a.m., There will be a full ramp closure on I-440 East off-ramp to 21st Avenue to saw damaged concrete. A detour will be in place.
• 10/11 at 8 p.m. – 10/13 at Noon, continuous, There will be a full ramp closure on I-440 East off-ramp to 21st Avenue to repair damaged concrete.
RUTHERFORD COUNTY I-840
The resurfacing on I-840 from near I-24 to near the West Fork Stones River.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for milling and paving activities (MM 50 – 55).
• 10/11 at 8 p.m. – 10/13 at 5 a.m., continuous, There will be alternating lane closures in both directions of milling and paving activities (MM 50 – 55).
Survey (MM 52 – 54).
• Daily (excluding weekends), 9 a.m. – 3 p.m., There will be intermittent inside and outside shoulder closures in both directions for survey work. Traffic control will consist of an attenuator truck by Superior Traffic Control.
• Nightly (excluding weekends), 8 p.m. – 5 a.m., There will be inside lane closures in both directions for survey work to the I-40 interchange. Traffic control will be provided by Superior Traffic Control.
WILLIAMSON COUNTY I-840
Aerial crossing of fiber optic cable.
• 10/13, first light – 9 a.m., There will be a rolling roadblock on I-840 for fiber optic aerial crossing (MM 20 and MM 20.8).
CHEATHAM COUNTY SR 249
The construction of a concrete box beam bridge on SR 249 over Dry Creek, including grading, drainage and paving.
• 10/10 – 10/16, continuous, The bridge will be reduced to one lane in order to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals.
DAVIDSON COUNTY SR 1
AT&T removing plate and restoring roadway.
• Daily, 9 a.m. – 3 p.m., There will be lane closures along SR 1 (West End Avenue) from Bowling Avenue to Craighead Avenue.
DAVIDSON COUNTY SR 6
Light conversion on S. Center Point Road to Walton Lane and exits 14 and 14B.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 11
The widening of US 31A (SR 11, Nolensville Pike) from North of the Mill Creek bridge to SR 254 (OHB) including bridges, retaining walls, signals, and lighting.
• Continuous, Holt Road will be closed to thru traffic until summer 2025. A detour is in place.
• Daily, 9 a.m. – 3 p.m., There will be temporary road closures on SR 11 and associated side roads for utility relocation, grading, and drainage.
DAVIDSON COUNTY SR 24
Resurfacing on US 70 (SR 24) from US 70 (SR 24, Broadway) to Cottage Lane.
• Nightly (excluding weekends), 8 p.m. – 5 a.m., There will be alternating lane closures on SR 24 for striping operations.
Work on Stewarts Ferry Pike to Bonnabrook Drive and ramp Exit 40.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 45
The removal of Portland Cement Concrete and repaving on SR 45 (Old Hickory Boulevard) at the intersection of US 31 E (SR 6, Gallatin Pike).
• Nightly, 8 p.m. – 5 a.m., There will be temporary lane and shoulder closures in both directions for final surfacing. At least two lanes will remain open in each direction.
The improvement of the intersection, including signals, on SR 45 (OHB) at Myatt Drive.
• 10/10 – 10/16, 9 a.m. – 3 p.m., There will be intermittent single lane closures in both directions along Old Hickory Boulevard for grading work.
Work on Graycroft Avenue to Gallatin Pike.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 65
Light conversion on Buena Vista Pike to Whites Creek Pike.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 112
Work from Briley Parkway to Eatons Creek Road.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 155
Milling and paving.
• 10/10, 8 p.m. – 5 a.m., There will be a closure of NB lanes 2 & 4 at MM 9.2 and the on-ramp from Opry Mills Drive to SR 155 North.
NES pole replacement.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures along Briley Parkway for pole replacement (MM 5.16 – 5.82).
Work on Lebanon Pike including ramp exits 8, 11, and 12 to Gallatin Pike.
• Daily, 9 a.m. – 3 p.m., There will be a lane closure for LED street light conversion.
DAVIDSON COUNTY SR 251
The resurfacing on SR 251 (River Road/OHB) from near Lakeview Drive to Charlotte Pike.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for milling and paving operations (MM 4 – 8.6).
DAVIDSON COUNTY SR 255
Blasting for MNAA TARI Phase 2; one blast per day at 1 PM CST.
• Daily, 12:55 p.m. – 1:05 p.m., There will be a complete road closure in both directions during blasting. All traffic will be held while blasting.
The grading, drainage, construction of bridges, retaining walls and paving on SR 55 over I-40 (MM 216) at the Donelson Pike interchange.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Donelson Pike for grading and utility work.
DAVIDSON COUNTY SR 265
The resurfacing on SR 265 (Central Pike) from SR 45 (OHB) to the Wilson County line.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for pavement markings.
DICKSON COUNTY SR 46
The construction of a box beam bridge on SR 46 over Yellow Creek.
• 10/10 – 10/16, Continuous, The bridge will be reduced to one lane in order to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals.
LINCOLN COUNTY SR 15
The resurfacing on US 64 (SR 15) from US 231 (SR 10) to Smithland Road, including bridge expansion joint repair and thin epoxy overlay.
• 10/10 – 10/16, continuous, There will be a lane closure on SR 15, bridge over Elk River for bridge epoxy overlay application. One lane will remain open at all times.
MAURY COUNTY SR 6
The repair of the bridges on SR 6 (US 43) over the Duck River.
• 10/11 – 10/15, 8 p.m. – 5 a.m., continuous, There will be a lane closures on SR 6 WB for bridge approach slab repairs. One lane will remain open at all times.
MAURY COUNTY SR 246
The Nashville SmartWay Intelligent Transportation System (ITS) maintenance.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures to install the overhead detection system (MM .52 – 1.12).
MONTGOMERY COUNTY SR 12
The resurfacing on SR 12 (Fort Campbell Boulevard).
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for milling and paving operations from Hermitage Drive to the Kentucky state line.
MONTGOMERY COUNTY SR 149
The repair of the bridge on SR 149 over Yellow Creek.
• 10/10 – 10/16, Continuous, The bridge will be reduced to one lane in order to demo and reconstruct the old bridge deck. Traffic will be controlled by temporary signals.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, drainage and construction of retaining walls.
• Daily, 9 a.m. – 3 p.m. There will be temporary lane closures for utility relocation, grading and drainage installation.
ROBERTSON COUNTY SR 76
The repair of the bridge on SR 76 over CSX Railroad.
• 10/10 – 10/16, continuous, The bridge will be reduced to one lane in order to demo and reconstruct the damaged beam and bridge deck. Traffic will be controlled by temporary signals.
RUTHERFORD COUNTY SR 1
The resurfacing on U.S. 70S (from south of Ash Street to near South Rutherford Boulevard)
• Nightly, 8 p.m. – 5 a.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 10
Intersection improvements on SR 10 (US 231) from south of Rock Springs Midland Road to north of Rock Springs Midland Road.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane and shoulder closures in both directions for new turn lane construction.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR 102 to E. of I-840.
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
• LOOK AHEAD: 10/18 at 6 p.m. – 10/21 at 5 a.m., The intersection of Jefferson Pike and Sam Ridley/Nissan Drive will be closed starting 6 p.m. Friday until 5 a.m. Monday. This is required to lower the existing grade of Sam Ridley to match the new grade of Jefferson Pike. Detour signage will be in place.
SUMNER COUNTY SR 6
The resurfacing on US 31E (SR 6) from near Greensboro Drive to south of Joann Street.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures in both directions for milling and paving operations (MM 11-15).
SUMNER COUNTY SR 386
The repair of the bridge on SR 386 over US 31E (SR 6/Gallatin Road) and Ramp F (MM 6.5 – 7).
• Nightly, 8 p.m. – 5 a.m., There will be lane closures in both directions for bridge repair activities.
• 10/11 – 10/14, 7 p.m. – 5 a.m. (continuous), There will be a weekend closure of the WB inside lane for bridge deck repairs, parapet repairs, and expansion joint replacement. There will also be an EB inside lane closure to reinstall the median wall.
• LOOK AHEAD: 10/18 – 10/21, 7 p.m. – 5 a.m. (continuous), There will be a weekend closure of the EB outside lane for bridge deck repairs, parapet repairs, and expansion joint repairs.
WILLIAMSON COUNTY SR 96
The resurfacing on SR 96 from the Dickson County line to near SR 100 (Fairview Boulevard), including thin epoxy overlay on the bridge over I-40.
• Daily, 9 a.m. – 3 p.m., There will be an alternating lane closure on SR 96 for paving marking operations.
WILLIAMSON COUNTY SR 106
City of Franklin installing water and sewer mains.
• Continuous, There will be lane closures and detours along SR 106 (Lewisburg Pike) in between SR 246 and E. Fowlkes St.
Hillsboro Road intersection improvements for SR 106 intersection.
• Daily, 9 a.m. – 3 p.m., There will be intermittent lane closures on the SR 106 intersection with SR 46 for grading work.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.